Step 1: Create technical drawing of the requested bottle shape (3-5 days) Or clients provide the drawing,Our analyze the technical feasibility and adjust if necessary. (3 days) (Provide the label artwork for technical analysis if needed)
Step 2: Make 2D drawing for clients’ approval (1 day)
Step 3: Open sample mould / 1 set (15-20 days)
Step 4: Produce clear bottle samples for clients’ approval (5-7 days) (Make decorated samples if needed /15 days )
Step 5: Order confirmed,finish mass production moulds / 10 sets (20 days)
Step 6: Clear bottle production (production time depends on the quantity)
Step 7: Quality checking and assurance
Step 8: Do paperless label printing if needed (QC & QA again)
Step 9: Packing for shipment
Step 10: Shipment